- Foreseeing the unforeseen... tough operating conditions trigger second opinion on integrity assessment
- Under considerable strain - software mods produce more accurate prediction
- Cold comfort - ratification for welds working in cryogenic conditions
- Verification of brass valve components for Air Products
- Drill pipe failure explained
- Fitness for purpose of duplex stainless steel risers for sour service
- Fitness for purpose of flanges built up by welding
- Engineering critical assessment of pipeline welds
- Revalidation of gas field facilities
- Downtime reduced after Ethylene plant assessment
- Team helps in Magnus repair
- Corrosion testing for seawater service
- TWI studies significance of Aleyaska pipeline flaws
- BS 7910 under the spotlight - case studies on ECA-based flaw acceptance criteria for pipe girth weld
Historical case studies:
- World Concord Tanker
- Typpi Oy Ammonia Plant Water Coolers
- Schenectady T2 Tanker
- Fawley Crude Oil Storage Tank
- Robert Jenkins Pressure Vessel
- Union Oil Amine Absorber Tower
- Ashland Storage Tank
For more information please contact: frm@twi.co.uk
Copyright © 2008 TWI Ltd
Information and advice from TWI and its partners are provided in good faith and based, where
appropriate, on the best engineering knowledge available at the time and incorporated into TWI's
website in accordance with TWI's ISO 9001:2000 accredited status. No warranty expressed or implied
is given regarding the results or effects of applying information or advice obtained from the
website, nor is any responsibility accepted for any consequential loss or damage.