New design of weldbonded refrigerated containers

Refrigerated container

Mærsk Container Industri AS began the development production process of a design for refrigerated transportation containers. The outer panels were of stainless steel with low carbon steel formed section longitudinal rails. Assembly was by resistance spot welding and weldbonding (spot welding plus adhesives).

This joining process was a radical departure from riveted/bolted structures and improved productivity resulted from using mechanised assembly in dedicated production cells. Other benefits included lower manufacturing costs, weight savings, increased payload and improved thermal efficiency.

Lloyd's approval to the appropriate ISO standards was given on the initial test containers. However, during early stages of production, weld quality problems appeared on the weldbonded side-wall to lower rail joints.

Mærsk Container Industri AS implemented a comprehensive programme of process improvements and testing but needed an independent specialist assessment of the situation.

TWI was asked to conduct a structured review of production methods, process control and joint quality to confirm the process suitability and to make recommendations to increase quality and reliability.

A TWI specialist visited the site to examine the welding equipment and procedures. After discussions with the client, a report was written providing recommendations for further refinement of the process. Implementation provided the process control needed and confidence in the spot welding and weldbonding processes for this application.

The recommendations made by TWI enabled Mærsk to improve the assembly methods and continue volume manufacture with confidence. As a result, costly modifications to the £15m dedicated plant were not needed.

Over 15 000 refrigerated containers were produced. No failures occurred after TWI's intervention.

Copyright ©2008 TWI Ltd

Search for related content 
Information and advice from TWI and its partners are provided in good faith and based, where appropriate, on the best engineering knowledge available at the time and incorporated into TWI's website in accordance with TWI's ISO 9001:2000 accredited status. No warranty expressed or implied is given regarding the results or effects of applying information or advice obtained from the website, nor is any responsibility accepted for any consequential loss or damage.
Tel : +44 (0)1223 899000
Fax : +44 (0)1223 892588
Email : twi@twi.co.uk