Structural integrity assured for Liverpool Bay
Flaws had been detected in rack welds on the Morecambe Flame jack-up rig (now called the Douglas Accommodation Platform) during refurbishment. These were old fabrication flaws discovered whilst non-destructive testing the side plates which join the racks to the legs. Cracking had occurred at the weld toe of each rack. The racks were fabricated from thick section high strength steel, so by trying to repair the old cracking more problems might be induced and worsen the problem. TWI needed to assess the situation - could structural integrity be maintained if nothing was done? Engineers at TWI used the stress data supplied and results from special shallow crack fracture mechanics tests (conducted on test samples taken from the racks) to analyse the situation. By carrying out an Engineering Critical Assessment they were able to show that the flaws would remain stable with respect to failure by fatigue and fracture over the next 30 years. This being the design life of the platform. Structural integrity was assured without repair. Copyright 2000, TWI Ltd | |
|
Information and advice from TWI and its partners are provided in good faith and based, where appropriate, on the best engineering knowledge available at the time and incorporated into TWI's website in accordance with TWI's ISO 9001:2000 accredited status. No warranty expressed or implied is given regarding the results or effects of applying information or advice obtained from the website, nor is any responsibility accepted for any consequential loss or damage.
| |
|
|