FPSs and FPSOs/System wide risk-based maintenance and inspection
System wide risk-based maintenance and inspection
A recent hull assessment study was estimated to have saved one of our clients US$100M in potential production losses. The structure was an intercept vessel (a new VLCC hull which was converted to a FPSO). The FPSO entered in operation in 2001 and is expected to be in service for about 20 years.
The following was achieved:
|
- 20 years of service
- avoid dry docking - improved productivity |
|
- improved safety
- optimised inspection - on-site maintenance/repair |
|
- added value investment
- focused investment planning |
Contact: oilandgas@twi.co.uk
Copyright © 2004 TWI Ltd
Information and advice from TWI and its partners are provided in good faith and based, where
appropriate, on the best engineering knowledge available at the time and incorporated into TWI's
website in accordance with TWI's ISO 9001:2000 accredited status. No warranty expressed or implied
is given regarding the results or effects of applying information or advice obtained from the
website, nor is any responsibility accepted for any consequential loss or damage.