FPSs and FPSOs/Single Client Projects and Case Studies

TWI conducts short-term project work and longer term research and development for its Industrial Member companies for product innovation, and to improve efficiency in all aspects of joining technology. As a result, Members from all industrial sectors can introduce novel designs, new fabrication or inspection techniques in order to improve business profitability or to enhance product safety and reliability.

TWI Industrial Members can also identify and contact individual specialists at TWI for answers to technical enquiries via our Contacts Online facility.

FPSs Single Client Projects (SCPs)

To respect confidentiality, generic titles of selected projects are given below:

  • Engineering critical assessment of cracked column in semi sub rig
  • Jack-up barge leg failure
  • Life extension of jack ups
  • Fatigue life extension of floating structures
  • Life extension of semi-sub drilling units
  • Spud can/chord cracking in jack-up rig
  • Review of specifications for a TLP
  • Repair of semi-sub production unit
  • Semi-sub rig conversion
  • Fatigue design of tether for a TLP
  • Materials characterisation for TLP tethers
  • Inspection of jack-up rig
  • Mooring support structure connection review

Full list of upstream single clients projects

FPSs case studies:

These case studies were written in collaboration with the customer concerned.

Full list of upstream case studies

FPSOs Single Client Projects (SCPs)

To respect confidentiality, generic titles of selected projects are given below:

  • ECA and development of in-situ repair for FPSO turret welds
  • Fracture and fatigue assessment of FPSO hull
  • FPSO fatigue design review
  • Consultancy on FPSO subsea development
  • FPSO structures - failure and repair
  • Complementary inspection of FPSO turret welds by phased array
  • Fatigue life improvement of FPSO hull critical components
  • ECA and inspection review of FPSO turret welds
  • Topside process system weld checks
  • Cracking in hyperbaric repair welds
  • Underwater friction welding trials
  • Mooring support structure connection review
  • Fatigue life extension of floating structures
  • Life extension of semi-submersible drilling units
  • Failure of a single leg mooring
  • Corrosion of welds in low alloys steels
  • Failure in a flare stack
  • Fatigue design review
  • Repair of semi-submersible production unit
  • Semi-submersible rig conversion
  • Underwater repair by friction stitch welding
  • Simulation of a hot tap weld

Case studies

Fitness for purpose of duplex stainless steel risers for sour service

More upstream case studies

Contact: oilandgas@twi.co.uk

Copyright © 2004 TWI Ltd
Information and advice from TWI and its partners are provided in good faith and based, where appropriate, on the best engineering knowledge available at the time and incorporated into TWI's website in accordance with TWI's ISO 9001:2000 accredited status. No warranty expressed or implied is given regarding the results or effects of applying information or advice obtained from the website, nor is any responsibility accepted for any consequential loss or damage.