Refineries/Single client projects/Case studies
TWI conducts short-term project work and longer term research and development for its Industrial Member companies for product innovation, and to improve efficiency in all aspects of joining technology. As a result, Members from all industrial sectors can introduce novel designs, new fabrication or inspection techniques in order to improve business profitability or to enhance product safety and reliability.
TWI Industrial Members can also identify and contact individual specialists at TWI for answers to technical enquiries via our Contacts Online facility.
Single Client Projects (SCPs)
To respect confidentiality, generic titles of selected projects are given below:
- ECA of gas choke valve
- Assessment of corroded nozzles
- FFP assessment of separator vessel
- Failure investigation of flame sprayed aluminium coating in process specific sulphur removal unit
- Investigation of failure of a condensate liquid feed line
- Reassessment of feed gas separator vessels for operation at -26°C
- Fatigue assessment of plant reactor coils
- High temperature at time of flight testing on vessesls in service at 2 refineries
- Repair of thick walled pressure vessels
- Improved non-destructive testing technology
- Plant in hydrogen service
- Plant in hydrogen sulphide service
- Deaerator cracking
- Storage of gases
- Welding of thermoplastic pipe
- NDT for mercury cracking in cryogenic plant
- Investigation of a hairpin tube section of a reformer unit
- Investigation of corroded B2 pipe fittings in HCL service
- Investigation and time to failure assessment of boiler tube failure
- In-situ replication at a refinery
- Failure of bellows in naptha stabiliser
- Advice on plastics pipe materials for chemical plant
- Cracking in flare tower
- Investigation of failure of a flare stack
- Failure of mono ethonolamine absorber vessel
Full list of upstream single clients projects
Case studies:
These case studies were written in collaboration with the customer concerned.
- Putting one's mind at rest... TWI okays service life estimate
- Foreseeing the unforeseen... tough operating conditions trigger second opinion on integrity assessment
- Structural integrity of a gas separation plant
- RISKWISE TM software sees action in Japan
- TWI training courses add to Phillips' inspection capability
Full list of upstream case studies
Copyright © 2005 TWI Ltd