NDT inspection of three kilometres of 10" gas line in Venezuela

Teletest ® has established a new productivity record in Venezuela. Working in conjunction with a local inspection company, TechCorr, Pi used Teletest ® to test just over 3km of 10-inch 9.8mm wall thickness above ground gas pipe in 12 working hours. A reason for this high productivity was the large range achieved. The A-scan below was typical. The line was free from significant corrosion. The peaks shown are reflections from the welds. Weld M is 150m from the transducer assembly. This means that 300m was inspected from each transducer location.

Teletest Long Range Ultrasonic System
Teletest Long Range Ultrasonic System

At one point along the pipe there was a valve station. There are three branches connecting to the line, two horizontal and one vertical. The A-scan from a position just outside the fence is shown. Peaks A and B show strong horizontal flexural responses (red lines) and are the signals from the two horizontal branches. Peak C, with a strong blue (vertical flexural) response is from the vertical branch. Note that it was possible to inspect the line beyond the branches.

oilgas_caseup38f2.jpg

The client was PDVSA, the national oil company.

Teletest Long Range Ultrasonic System